Sorry, you need to enable JavaScript to visit this website.

Project Overview

Image
Ethanac study area map

The County of Riverside Transportation Department (CRTD) in cooperation with the Riverside County Transportation Commission (RCTC) and the Cities of Lake Elsinore, Menifee and Perris conducted a planning study with the intent of recommending enhancements that will improve regional east-west movement and connectivity between Interstate 15 (I-15) and Interstate 215 (I-215) and beyond. This study evaluated vehicular mobility along the corridor and provided a future vision for the corridor. The study will provide guidance that will assist in the effort to both fund and build the corridor improvements.

Funding from CRTD and RCTC to implement the entire corridor vision is not currently available, however the respective Cities will be responsible for constructing gap closures and localized improvements to maintain operational continuity until regional funding is available for the full corridor implementation.

CRTD on behalf of the City of Perris is moving forward with interchange improvements on Ethanac Road at I-215 as identified in the corridor study. Click here for more information on the I-215 / Ethanac Road Interchange Improvements Project. 
 

Project Schedule

  • Ethanac Expressway Study: Summer 2020 (Complete)
  • Environmental Clearance Phase: TBD
  • Final Design: TBD
  • Right of Way: TBD
  • Project Construction Start: TBD
  • Construction Completion: TBD