Sorry, you need to enable JavaScript to visit this website.

Project Overview

Limits: From Via Del Monte to Calle Contento 

The County of Riverside Transportation Department proposes reconstructing Pauba Road between Via Del Monte and Calle Contento, an approximate 1.1 mile segment, in the Community of Rancho California. Pauba Road will be realigned both vertically and horizontally for better drivability and widened from the existing 20’ wide road to a 26’ wide road. The project will consist of removing the existing roadway, regrading the terrain to enhance existing sight distance, and repaving with new asphalt. 

The project also proposes to improve drainage with new culverts and/or replacement of existing culverts, providing graded shoulders for equestrian use, and enhancing the striping and signing throughout the project limits.

Project Schedule

  • Construction Start: March 2025
  • Anticipated Construction End:  May 2026

Working Hours: Monday through Friday, 7AM-6PM 
Access: Lane Closures permitted during working hours

Project Contact

Alfredo Martinez, Project Manager 

(951) 955-0086 
[email protected]

Image
Pauba Rd Reconstruction Project Flyer